Low Value Disputes Adjudication
The CIC Low Value Disputes Adjudication is described thus: 'Adjudication is a way of resolving disputes in construction contracts. The Construction Act* provides parties to construction contracts with a right to refer disputes arising under the contract to adjudication. It sets out certain minimum procedural requirements which enable either party to a dispute to refer the matter to an independent party (the adjudicator) who is then required to make a decision within 28 days of the matter being referred.'
'Whereas the object of adjudication is to reach a fair, rapid and inexpensive decision upon a dispute arising under the Contract, there is evidence that Parties are deterred from using adjudication because of the costs involved. To address this problem, the CIC has published the CIC Low Value Disputes Model Adjudication Procedure (CIC LVD MAP). The CIC LVD MAP sets out a streamlined adjudication procedure for Low Value Disputes, and, by linking the Adjudicator’s fee to the amount claimed, provides certainty as to how much the Adjudicator will be paid for making an Adjudicator’s Decision. By including an outline timetable for the procedural stages it provides a flexible yet simple to understand approach to the key elements of the adjudication process.'
'The CIC LVD MAP can be adopted if the Parties have incorporated it into the Contract by reference, the reference shall be deemed to be to the edition current at the date of the Notice of Adjudication, unless expressly stated otherwise in the Contract. Alternatively, the Parties may agree to use the procedure on an ad-hoc basis when a dispute arises.'
[edit] Related articles on Designing Buildings
- Adjudicator.
- Adjudicator Nominating Body ANB.
- Adjudication.
- Adjudicators and bias.
- Alternative dispute resolution.
- Alternative Dispute Resolution legislation.
- Arbitration.
- Arbitration v Adjudication.
- Breach of contract.
- Causes of construction disputes.
- Conciliation
- Contract claims.
- Contract conditions.
- Dispute resolution.
- Dispute resolution board.
- Expert determination.
- How does arbitration work?
- Joinder.
- Low Value Disputes Model Adjudication Procedure.
- Low Value Disputes Procedure LVDP.
- Mediation.
- Pay now argue later.
- Pendulum arbitration.
- PFIs and adjudication.
- The Housing Grants, Construction and Regeneration Act.
- The role of the mediator.
- The Scheme for Construction Contracts.
[edit] External Links
https://www.cic.org.uk/services/adjudication/cic-low-value-disputes-adjudication
Featured articles and news
Editor's broadbrush view on forms of electrical heating in context.
The pace of heating change; BSRIA market intelligence
Electric Dreams, Boiler Realities.
New President of ECA announced
Ruth Devine MBE becomes the 112th President of the Electrical Contractors Association.
New CIAT Professional Standards Competency Framework
Supercedes the 2019 Professional Standards Framework from 1 May 2025.
Difficult Sites: Architecture Against the Odds
Free exhibition at the RIBA Architecture Gallery until 31 May.
PPN 021: Payment Spot Checks in Public Sub-Contracts
Published following consultation and influence from ECA.
Designing Buildings reaches 20,000 articles
We take a look back at some of the stranger contributions.
Lessons learned from other industries.
The Buildings of the Malting Industry. Book review.
Conserving places with climate resilience in mind.
Combating burnout.
The 5 elements of seiri, seiton, seiso, seiketsu and shitsuke.
Shading for housing, a design guide
A look back at embedding a new culture of shading.
The Architectural Technology Awards
The AT Awards 2025 are open for entries!
ECA Blueprint for Electrification
The 'mosaic of interconnected challenges' and how to deliver the UK’s Transition to Clean Power.
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.